PROJECTS

Project:

Sacramento International Airport Runway 16R-34L Rehabilitation

Scope:

Over the course of an aggressive five-month Runway Closure Schedule SBE installed over 500 new Runway and Taxiway Light Bases and Fixtures, 20,000 LF of encased duct bank, 200,000 LF of Airfield Cable and re-built the ALSF Approach Lighting System.  At this same time the West Electrical Vault was upgraded with new Regulators and the Airfield Lighting Control System was updated.

Location:

Sacramento, CA

Owner:

County of Sacramento

GC:

Granite Construction Company

Project:

Sacramento Executive Airport Closure of Runway 16/34

Scope:

Over four phases of construction trench and directional bore new electrical and lighting ductbanks.  Remove existing in-pavement and shoulder lighting.  Core to install new base cans for new in-pavement and shoulder lighting.  Furnish and install new runway and taxiway signs.  Extremely fast paced schedule and coordination with General Contractor.

Location:

Sacramento, CA

Owner:

County of Sacramento

GC:

McGuire Hester